Max Wild Logistics Campus in Illerbachen
Commercial Projects
The new logistics campus at the headquarters in Berkheim is located on an existing property. The existing 10,000 m² of warehouse space has been expanded by an additional 20,000 m² of new warehouse, logistics, and production space. The resulting modern warehouses provide space for frost-free storage of machinery and production materials, such as castings and sheet metal parts, as well as a wide variety of palletized goods in all sizes. Max Wild uses the state-of-the-art storage space both for its own operations and for its customers. A total of four warehouse bays have been constructed: Two are designed for ground-level bulk storage of heavy goods, while the other two will accommodate storage both at ground level and on shelving systems.
Wild Projektentwicklung GmbH took charge of project management for the construction of the new logistics campus. The company has made it its mission to sensibly develop and repurpose vacant buildings and land using innovative concepts—ranging from inner-city sites to the development of building lots.
Ort
Illerbachen
Kurzprofil
- 4,500 m³ of concrete poured
- 450 metric tons of structural steel installed
- 10,000 m² of roof area sealed
- 3,000 m² of facade installed
- 5,750 metric tons of precast concrete elements installed

Documents for Download
At a Glance







Do you have any questions about this? Please contact us!
Ansprechpartner

Stefan Geiger
Geschäftsführer Wild Projektentwicklung GmbH
Geschäftsführer Wild Bauland GmbH

Josef Staller
Leiter Vertrieb und Projektentwickler

Jasmin Kaiser
Assistenz Projektentwicklung